PFP Logo

12,000 gallons of Turbine Reservoir Oil filtered during 2-day outage

Nov 12, 2020 | Maintenance, Oil Quality & Purification, Power Generation

  1. Home
  2. Maintenance
  3. 12,000 gallons of Turbine Reservoir Oil filtered during 2-day outage

High-Velocity Flushing SkidHere we are back again with some more notes from the industrial filtration field…

This time a power generation facility in central Pennsylvania needed their turbine reservoir oil cleaned during a scheduled outage. Approximately 12,000 gallons of oil need to be cleaned from ISO 4406 22/20/16 to ISO 4406 17/15/12 or better.

Day 1: Utilizing one of our variable-flow 600 GPM flushing skids and a portable laser particle counter, we hooked up to the reservoir and started flowing. After just two hours the ISO codes started dropping, almost to the desired cleanliness code by the end of day one.

Day 2: We started flushing the oil at 7:00 A.M. and we were able to clean the oil to ISO 14/13/9 by 1:00 P.M.  After breaking down the system and cleaning up we started our journey home by day’s end… another success story!

Do YOU have any questions about our on-site flushing services or about filtering turbine reservoir oil?

Here at PFP, I actually manage the operations, including all types of equipment rental services.

Feel free to get in touch with us and ask to speak with me directly.

— Matt @ PFP

Contact an Expert

Need assistance? PFP will help you solve your industrial filtration challenges.

1-888-679-6645 / sales@pfpusa.com

Related Blog Posts

Moisture in Hydraulic Systems: Causes, Risks, and Solutions

Moisture in Hydraulic Systems: Causes, Risks, and Solutions

Moisture is by far one of the most common and damaging contaminants found in hydraulic systems. It often goes unnoticed until its presence inevitably causes performance issues, equipment damage, and fluid degradation. This blog outlines how moisture enters hydraulic...

How Rental Filtration Equipment Keeps Projects on Schedule

How Rental Filtration Equipment Keeps Projects on Schedule

In industrial environments, schedules are rarely flexible. Facility shutdowns are planned far in advance while maintenance windows become increasingly tight. When delays happen, they are often the result of unexpected contamination on a large scale. If facility...

Follow us on social media!

Contact an Expert

Need assistance? PFP will help you solve your industrial filtration challenges.

1-888-679-6645 / sales@pfpusa.com

Want the most up to date information from PFP?

Sign up for our E-mail newsletter!